City of Santa Barbara Lower Mission Creek Flood Control Project (Component 6); Santa Barbara Countywide Integrated Regional Water Management (IRWM) Implementati

9 Documents in Project

Summary

SCH Number
1998101061
Lead Agency
City of Santa Barbara
Document Title
City of Santa Barbara Lower Mission Creek Flood Control Project (Component 6); Santa Barbara Countywide Integrated Regional Water Management (IRWM) Implementati
Document Type
NOD - Notice of Determination
Received
Posted
5/21/2009
Document Description
Component 6 is a part of the larger Lower Mission Creek Flood Control Project, and will reconstructed a portion of Lower Mission Creek to improve flood flow conveyance, reduce erosion, and improve water quality. Component 6 involves removing old and various forms of bank revetment, widening the creek channel, increasing channel capacity to ~3,400 cubic ft per second, and providing an ~20 yr level of flood protection. Natural channel banks will be constructed and stabilized, where feasible. A structure near Mason Street may be removed as part of the Project, and a lagoon will be constructed in its place. The Project also includes removing non-native plants, plating riparian vegetation, and constructing goby refuges, fish ledges and fish baffles.

Contact Information

Name
Lisa Lee
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Santa Barbara
Counties
Santa Barbara
Cross Streets
Between Carrillo St. and the Ocean
Zip
93101
Total Acres
N/A
Parcel #
Several Dozen
State Highways
US 101, SR 225, SR 192-SR 144
Railways
UPRR
Schools
Santa Barbara City College
Waterways
Mission Creek, Laguna Channel

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes