Camray Borrow Site and Additional Aspects of the North Beach Lake Levee Improvement Project
10 Documents in Project
Summary
SCH Number
1997102056
Lead Agency
Sacramento Area Flood Control Agency
Document Title
Camray Borrow Site and Additional Aspects of the North Beach Lake Levee Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
8/26/2011
Present Land Use
Recreation Reserve with Flood Combining Zone/Agricultural cropland with a Resource Conservation Area Combining District.
Document Description
The U.S. Army Corps of Engineers (Corps) propose to construct approximately 3000 feet on floodwall, 100 feet of levee and 900 feet of retaining wall on the east side of the Union Pacific Railroad tracks adjacent to Morrison Creek in South Sacramento. The project will include excavation of existing material, construct the floodwall, retaining wall, and levee and complete by reseeding with native grasses. The Morrison Creek/UPRR project would complete Section 1B1 and provide 100-year event flood protection along Morrison Creek.
Contact Information
Name
Lance Salisbury
Agency Name
Central Valley Flood Protection Board
Contact Types
Lead/Public Agency
Phone
Location
Cities
Sacramento
Counties
Sacramento
Cross Streets
Meadowview Road/Franklin Boulevard
Total Acres
5.5
Railways
UPRR
Waterways
Morrison Creek
Notice of Determination
Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.