SAN SIMEON COMMUNITY DISTRICT PARTICIPATION IN CAMBRIA

Summary

SCH Number
1995101767
Lead Agency
San Simeon Community Sevices District
Document Title
SAN SIMEON COMMUNITY DISTRICT PARTICIPATION IN CAMBRIA
Document Type
NOD - Notice of Determination
Received
Posted
10/12/1995
Document Description
THE SAN SIMEON COMMUNITY SERVICES DISTRICT WILL RECEIVE UP TO 150,000 GALLONS PER DAY OF POTABLE WATER PRODUCED FROM THE CAMBRIA DESALINATION FACILITY. THE WATER WILL BE PUMPED THROUGH AN 8" TRANSMISSION LINE. THE PIPELINE LENGTH FROM THE SAN SIMEON CREEK ROAD TURNOUT TO THE SSCSD'S BOUDARY IS APPRX. 1.4 MILES. IT IS PROPOSED THAT THE PIPELINE CONTINUE NORTHERLY APPRX. ONE-HALF-MILE THROUGH THE COMMUNITY OF SAN SIMEON TO PICO AVE. AT TH DISTRICTS NORTHERLY BOUNDARY AND CROSSING THE COUNTY FRONTAGE ROAD RIGHT-OF-WAY (CASTILLO DRIVE) AND THEN EASTERLY ON SSCSD'S PICO AVENUE APPRX. 1,000 FEET EASTERLY TO THE DISTRICTS BOUNDARY. THE PIPELINE WOULD THEN BE CONSTRUCTED WITHIN AN EXISTING EASEMENT TO THE DISTRICT'S 247,OOO-GALLON WATER STORAGE TANK LOCATED APPRX. 1,000 FEET EASTERLY

Contact Information

Name
SUSAN OSTROV
Agency Name
SAN SIMEON COMMUNITY SERVICES DISTRICT
Contact Types
Lead/Public Agency

Location

Cities
SAN SIMEON
Counties
San Luis Obispo

Notice of Determination

Approving Agency
N/A

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print