CAMBRIA DESALINATION FACILITY-ADDENDUM TO FINAL EIR
Summary
SCH Number
1995101450
Lead Agency
Cambria Community Services District
Document Title
CAMBRIA DESALINATION FACILITY-ADDENDUM TO FINAL EIR
Document Type
NOD - Notice of Determination
Received
Posted
9/1/1995
Document Description
THE CAMBRIA COMMUNITY SERVICES DISTRICT (CCSD) PROPOSES TO CONSTRUCT A DESALINATION FACILITY TO PROVIDE A SOURCE OF DRINKING WATER TO THE COMMUNITY. THE PROJECT IS DESIGNED TO PROVIDE 1.008 MILLION GALLONS PER DAY (MGD) FOR THE CCSD'S PROJECTED DEMANDS. ADDITIONAL CAPACITY IS PROVIDED FOR THE SAN SIMEON COMMUNITY SERVICES DISTRICT OF APPROX. 0.144 MGD FOR A TOTAL PRODUCTION CAPABILITY OF 1.15 MGD. THE CCSD HAS COMPLETED AND CERTIFIED THE FINAL EIR FOR THE CCSD FACILITIES. THE PARTICIPATION OF THE SSCSD REQUIRES THAT THE SSCSD PERFORM THEIR OWN CEQA DOCUMENT- ATION AND PERMITTING REQUIREMENTS FOR THEIR FACILITIES. THE PROPOSED DESALINATION PLANT IS TO BE LOCATED IN THE VINCINITY OF THE CCSD'S EFFLUENT DISPOSAL PONDS, SAN SIMEON STATE PARK AND SAN SIMEON STATE BEACH. THE FACILITY WOULD WITHDRAW WATER DIRECTLY FROM THE OCEAN USING AN INTAKE PIPING SYSTEM. WATER WOULD BE FED TO A PLANT LOCATED ON DISTRICT PROPERTY ADJACENT TO THE NORTH SIDE OF THE EFFLUENT DISPOSAL PONDS. BRINE REJECT WATER WOULD BE ROUTED BACK TO THE OCEAN THROUGH A PARALLEL PIPELINE AND DISCHARGED INTO AN OCEAN OUTFALL. THE INTAKE/DISCHARGE PIPELINE WOULD BE LOCATED ALONG SAN SIMEON CREEK ROAD, AND TRAVERSE A VACANT PARCEL (013-051-016) TO THE OCEAN. THE PARCEL IS AN AREA INACCESSIBLE TO THE PUBLIC, NORTH OF
Contact Information
Name
DAVE ANDRES
Agency Name
CAMBRIA COMMUNITY SERVICES DIST.
Contact Types
Lead/Public Agency
Address
Phone
Location
Cities
Cambria
Counties
San Luis Obispo
Notice of Determination
Approving Agency
N/A
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.