Demenno/Kerdoon

6 Documents in Project

Summary

SCH Number
1995031067
Lead Agency
Department of Toxic Substances Control
Document Title
Demenno/Kerdoon
Document Type
NOD - Notice of Determination
Received
Posted
7/9/2020
Present Land Use
Used Oil Recycling Facility
Document Description
The California Department of Toxic Substances Control (DTSC), pursuant to authority granted under Division 4.5, California Code of Regulations, Title 22, Chapter 20, is approving a Class 1* Permit Modification (Modification) for the Hazardous Waste Facility Permit. The Modification will allow the permittee to accept recycled oil and exempt oil and combine it with used oil and/or waste oil at the Demenno/Kerdoon facility. The mixture will be treated at the facility. The additional materials will be received and stored in Unit 4 and other designated existing tanks. The new materials will be treated in one or a combination of Unit 6 (dehydration), Unit 7 (distillation), or Unit 8 (the Naphtha System). The location, operation, and function of the units will remain unchanged. No changes in capacity, or construction will result from the additional allowable materials.

Contact Information

Name
Ricardo Gonzalez
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Name
Agency Name
Jeff Baxter, Senior Vice President, World Oil Corporation
Contact Types
Project Applicant

Location

Cities
Compton
Counties
Los Angeles
Zip
90222
Other Location Info
2000 North Alameda St., Compton, California 90222

Notice of Determination

Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search Print