Promontory Open Space Multi-Use Trail Project (Lake or Streambed Alteration Agreement No. 1600-2017-0156-R2)
7 Documents in Project
Summary
SCH Number
1994112056
Lead Agency
El Dorado County
Document Title
Promontory Open Space Multi-Use Trail Project (Lake or Streambed Alteration Agreement No. 1600-2017-0156-R2)
Document Type
NOD - Notice of Determination
Received
Posted
7/31/2018
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0156-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Russell-Promontory, LLC as represented by Mr. Ron Bertolina, to Elliot Homes, Inc., as represented by Mr. Price Walker.
Project is limited to the construction of three (3) pedestrian bridges (Crossings A - C) over three unnamed tributaries to Humbug Creek as part of a larger multi-use trail within the Promontory Specific Plan. Crossing A will be 8 feet wide and span 25 feet from bank to bank. Crossings B and C will both be 3 feet wide and span 8 feet from bank to bank. All three bridges will include associated concrete footings, wing walls, and retaining walls, which will be placed outside of the stream channel.
During construction, temporary haul road bridges will be installed over the streams to facilitate the movement of equipment and construction materials across the site. The temporary haul road bridges will be installed over the streams to facilitate the movement of equipment and construction materials across the site. The temporary haul road bridges will be 8 feet wide and 40 feet long with timber bulkheads over filter fabric and native soils to support a railroad flat deck. Approach ramps will consist fo two 8-foot by 20-foot areas surfaced with 6 inches of 1-1/2 inch crushed rock.
Contact Information
Name
Gabriele Quillman
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Cities
EL DORADO HILLS
Counties
El Dorado
State Highways
50
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.