Grit Processing Facility Upgrades
9 Documents in Project
Summary
SCH Number
1994101024
Lead Agency
City of San Diego
Document Title
Grit Processing Facility Upgrades
Document Type
NOD - Notice of Determination
Received
Posted
3/26/2009
Document Description
The project purposes to improve grit collection and removal processes of the Pint Loma Wastewater Treatment Plant (PLWTP) to enhance removal of suspended solids from sewage. Enhanced removal of suspended solids would continue compliance with the conditions of the Nationa Pollution Discharge Elimination System (NPDES) permit number CA0107409 for the Point Loma Outfall. The Grit Processing improvements project scope involves three components: 1) demolition and replacement of the existing Headworks Building Complex, 2) improvements to the existing odor control system, and 3) replacement of the grit handling system and two grit tanks and associated aeration, pump, piping, and systems. The Development Services Department (DSD) has completed a CEQA Section 21166 evaluation for the Grit Processing Improvement Project which is located within the PLWTP. This review was limited to consideration of CEQA issues associated with the proposed project. DSD considered the previously certified Addendum to an EIR No. 94-5010, SCH# 1994101024 (Project No. 42-0358) in determining consistency pursuant to Section 21166 of CEQA.
Contact Information
Name
Dirk Smith
Agency Name
City of San Diego
Contact Types
Lead/Public Agency
Phone
Location
Cities
San Diego
Counties
San Diego
Cross Streets
Cabrillo Memorial Drive and Gatchell Road
Total Acres
0.2
Parcel #
532-520-0600
Waterways
Pacific Ocean and San Diego Bay
Notice of Determination
Approving Agency
City of San Diego
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No