Santa Barbara Municipal Airport Master Plan Update, Supplemental EIR ENV97-0573

9 Documents in Project

Summary

SCH Number
1993081127
Lead Agency
City of Santa Barbara
Document Title
Santa Barbara Municipal Airport Master Plan Update, Supplemental EIR ENV97-0573
Document Type
NOD - Notice of Determination
Received
Posted
6/23/2000
Document Description
The proposed project involves the installation of above-ground fuel storage tanks consisting of two 20,000-gallon Jet A, one 12,000-gallon aviation fuel (AVGAS), and one 1,000 gallon diesel and unleaded motor gas (MOGAS). The tanks would be placed on a concrete foundation with stormwater containment curbs and a stormwater collection sump. An oil / water separator would be installed in the foundation adjacent to the proposed tanks. A six-foot high chain-link fence would surround the tanks. The existing Airport Operations Area (AOA) Security Fencing would be relocated to encompass the entire facility. The facility would be accessed by a new circular driveway off of Firestone Road.

Contact Information

Name
Bill Jacobs
Agency Name
City of Santa Barbara
Contact Types
Lead/Public Agency

Location

Cities
Santa Barbara
Counties
Santa Barbara
Cross Streets
Hollister Ave., David Lowe Place, Frederick Lopez Rd.,
Total Acres
15
Parcel #
73-080-36
State Highways
101
Railways
yes
Airports
yes
Schools
yes
Waterways
yes

Notice of Determination

Approving Agency
City of Santa Barbara
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes