Desilting of Lake Elizabeth
3 Documents in Project
Summary
SCH Number
1991113077
Lead Agency
City of Fremont
Document Title
Desilting of Lake Elizabeth
Document Type
NOD - Notice of Determination
Received
Posted
11/26/2001
Document Description
The California Department of Fish and Game (DFG) is executing a Lake and Streambed Alteration Agreement (R3-2001-0359) pursuant to Section 1601 of the Fish and Game Code to the project applicant, George Sukkar/Alameda County Public Works Agency. The applicant proposes to remove approximately 75,000 cubic yards of sediment from approximately one-half of the lake and distribute that sediment over settling basins adjacent to the lake. A floating dredge would be used to remove the sediment in a water slurry, which would then be transported through pipes to the settling basins. Sediment would be allowed to settle out of the water before the water would be returned to the lake. The project is necessary to increase the storage capacity of the lake and enhance its flood protection capacity prior to the onset of the winter rainy season. The project is located at Lake Elizabeth in an 82-acre man-made lake southeast of Fremont, California, in Alameda County (Section 34, Township 4 South, Range 1 West, Assessor's Parcel Number 525-0001-010-00). The lake was constructed in 1966 to provide flood protection for the area during periods of high rainfall.
Contact Information
Name
Bob Schneider
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Fremont
Counties
Alameda
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
N/A