Lodestar Master Plan Amendment - District Zoning Amendment 12-002
10 Documents in Project
Summary
SCH Number
1991105212
Lead Agency
City of Mammoth Lakes
Document Title
Lodestar Master Plan Amendment - District Zoning Amendment 12-002
Document Type
NOD - Notice of Determination
Received
Posted
6/10/2013
Document Description
1. Realign the boundaries of the Master Plan development areas to match existing development and property lines to date and clarify the remaining permitted density for the undeveloped areas. This includes moving certain properties from Development Area 4 to Area 2. The overall density of the master Plan is not increased.
2. Allow transient rentals as a permitted use in Development Area 1 (i.e., Lodestar Drive), consistent with the Planning and Economic Commission's direction from May 9, 2012. Transient rentals are currently allowed with use permit; this would eliminate the use permit requirement.
3. Allow single family detached dwellings in Development Area 5 south of West Bear Lake Road and east of Sierra Star Parkway, and allow these single family detached dwellings to be subject to Residential Single Family Zone setbacks, building height, and lot coverage standards.
4. Set the minimum building separation required in Development Area 2 to twenty feet.
5. Amend the minimum required right-of-way for a street fronted on both sides by golf course.
Contact Information
Name
Jen Daugherty
Agency Name
Town of Mammoth Lakes
Contact Types
Lead/Public Agency
Phone
Location
Cities
Mammoth Lakes
Counties
Mono
Notice of Determination
Approving Agency
Mammoth Lakes Planning Commission
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes