Charles E. Mayer Desalination Plant Reactivation Project

7 Documents in Project

Summary

SCH Number
1990010859
Lead Agency
City of Santa Barbara
Document Title
Charles E. Mayer Desalination Plant Reactivation Project
Document Type
NOD - Notice of Determination
Received
Posted
8/11/2015
Document Description
The project proposes the reactivation of the previously approved and constructed Charles E. Meyer Desalination Plant. The project would bring the facility back into service from its standby mode condition, to initially produce 3,125 AFY, and potentially up to 7,500 AFY, of potable water as provided in the City's Long Term Water Supply Plan. The Reactivation Project involves no expansion of use or increased capacity above that previously reviewed, analyzed and approved for the existing facility. The Reactivation Project involves maintenance, repair, replacement and upgrades of equipment and other project components that would be located in the same general location for the same or similar use, and be of similar size and height, as previously approved.

Contact Information

Name
Steven Greer
Agency Name
City of Santa Barbara
Contact Types
Lead/Public Agency

Location

Cities
Santa Barbara
Counties
Santa Barbara
Cross Streets
U.S. 101, YANDNALI STREET
Total Acres
1
Parcel #
17-54-03
State Highways
101
Railways
SPRR
Waterways
LAGUNA CHANNEL

Notice of Determination

Approving Agency
City of Santa Barbara
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print