Concurrence in the Issuance of Revised Solid Waste Facility Permit (SWFP) No. 45-AA-0020 for the Anderson Landfill, Inc., Shasta County

5 Documents in Project

Summary

SCH Number
1989052316
Lead Agency
Shasta County
Document Title
Concurrence in the Issuance of Revised Solid Waste Facility Permit (SWFP) No. 45-AA-0020 for the Anderson Landfill, Inc., Shasta County
Document Type
NOD - Notice of Determination
Received
Posted
6/18/2008
Present Land Use
The property is in the Industrial (I) General Plan land use designation and the Planned Development (PD) zone district.
Document Description
Changes that will be authorized by the issuance of revised SWFP No. 45-AA-0020, include: (1) an increase in the Maximum Depth of Excavation from 620 feet above mean sea level (aMSL) to 580 feet aMSL; (2) an increase in the total Design Capacity from an estimate of 13,000,000 cubic yards to a Design Capacity of 16,353,000 cubic yards; (3) an increase in the Remaining Capacity from 9,094,800 cubic yards to 11,914,025 cubic yards; and (4) an increase in the Estimated Closure Year from 2042 to 2055.

Contact Information

Name
John Loan
Agency Name
California Integrated Waste Management Board
Contact Types
Lead/Public Agency

Location

Cities
Anderson
Counties
Shasta
Cross Streets
West Anderson Drive/ Cambridge Road
Zip
96007
Total Acres
270
Parcel #
207-170-08, 09, 11, 12, 13, 14, 15, 16 and 42 and 207-390-09
Schools
West Valley/ West Cottonwood
Waterways
Tributary to Cottonwood Creek
Township
30W
Range
4W
Section
29-31
Base
Mt Diabl

Notice of Determination

Approving Agency
California Integrated Waste Management Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print