Mountain Gate Specific Plan; SPA 00-001, TM 5193 RP3, R 00-003, LOG 81-08-173a
4 Documents in Project
Summary
SCH Number
1983022301
Lead Agency
San Diego County
Document Title
Mountain Gate Specific Plan; SPA 00-001, TM 5193 RP3, R 00-003, LOG 81-08-173a
Document Type
NOD - Notice of Determination
Received
Posted
11/13/2001
Document Description
The project is a Specific Plan that proposes to permit the construction of 156 single family detached dwelling units on one acre minimum lots. This residential development is located on a series of raised ridges north of the City of Escondido and east of Interstate 15 in the North County Metropolitan Planning Area of north central San Diego County. The houses, pads, and associated roads are distributed along the tops of ridges. The lots are clustered, leaving 563 acres of the 694-acre site for ongoing use as an avocado orchard (173 acres) and as dedicated biological open space (236.7 acres). The avocado orchard will be maintained in a series of agricultural lots that will be professionally maintained. The subdivision will be served by 4.1 miles of private roads, with the main gated entry located at Mountain Meadow Road. Grading will include a total of 600,000 cubic yards of cut and fill, with maximum cut and fill slopes of 35 and 45 feet respectively. Potential visual impacts will be mitigated through implementation of a landscape plan. The project will be built in a series of seven phases. Sewer and water services will be provided by the Valley Center Municipal Water District. Fire protection will be provided by the Deer Springs Fire Protection District.
Contact Information
Name
Glen Russell
Agency Name
County of San Diego, Dept. of Planning and Land Use, MS O650
Contact Types
Lead/Public Agency
Phone
Location
Counties
San Diego
Total Acres
661
Notice of Determination
Approving Agency
County of San Diego Board of Supervisors
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.