SCH Number 2020050308


Project Info

Title
Central Valley Ag Group Bulk Whole Cottonseed Transload Facility at the Port of Stockton Final Initial Study/Mitigated Negative Declaration
Description
CVAG is proposing to establish a new transloading facility at the Port to receive whole cottonseed by rail and transport it out of the Port by truck. As part of the proposed project, CVAG would construct a small concrete apron pad on an existing Port concrete pad lot; fill and level holes in the existing concrete pad lot; install a portable modular-type office, truck scale, portable toilet, diesel fuel tank, fuel storage compartment, and auxiliary generator at the project site; and designate part of the project site as a parking lot. The proposed project would not require new permanent buildings or infrastructure improvements and would not include berth or in-water work. Electricity would be provided to the project site through an existing power pole at the southwest corner of the project site.
Download CSV New Search

 

3 documents in project

Type Lead/Public Agency Received Title
Port of Stockton Central Valley Ag Group Bulk Whole Cottonseed Transload Facility at the Port of Stockton Final Initial Study/Mitigated Negative Declaration
Port of Stockton Central Valley Ag Group Bulk Whole Cottonseed Transload Facility at the Port of Stockton Notice of Determination
Port of Stockton Central Valley Ag Group Bulk Whole Cottonseed Transload Facility at the Port of Stockton