SCH Number 2007042103


Project Info

Title
Chico Groundwater- Central Plume
Description
The proposed project will construct, install and operate two extraction wells (CMW-119B and CMW-18B1) and one irrigation well (CMW-126B); conveyance piping from each extraction well and connecting piping to the existing groundwater treatment system. A monitoring well (CMW-128B) will also be constructed down gradient from well CMW-106B. Well CMW-118B1 is proposed for installation in the eastern portion of the Flair Source Area. Well CMW 119B is proposed for installation down gradient of the Flair Source Area and the well CMW-126 is proposed for installation on the leading edge of the plume. Each well will be screened within the intermediate Zone Aquifer (IZA).
Download CSV New Search

 

4 documents in project

Type Lead/Public Agency Received Title
Department of Toxic Substances Control Chico Groundwater- Central Plume
Department of Toxic Substances Control Chico Groundwater- Central Plume
Department of Toxic Substances Control Chico Groundwater- Central Plume
Department of Toxic Substances Control Chico Groundwater- Central Plume