North River Apartments Project (Lake or Stream bed Alteration Agreement No. 1600-2019-0203-R3)

2 Documents in Project

Summary

SCH Number
2017082027
Lead Agency
City of Petaluma
Document Title
North River Apartments Project (Lake or Stream bed Alteration Agreement No. 1600-2019-0203-R3)
Document Type
NOD - Notice of Determination
Received
Posted
10/16/2019
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement number 1600-2019-0203-R3, pursuant to section 1602 of the Fish and Game Code to.the project Applicant, North River Apartments, LLC.The project is limited to the construction of a culvert outfall into the Petaluma river, consisting of a 30-inch high density polyurethane (HOPE) culvert that discharges onto a rock mat dissipator, all above the high tide line. The total impact of the outfall is approximately 199 square feet of temporary impact, seeing as there is already riprap in place over the entire footprint of the outfall. The existing riprap will be removed and replaced by the outfall structure. The project also consists of a retaining wall to support a small section of a sidewalk. The retaining wall and sidewalk will have a temporary impact of approximately 344 square feet and a permanent impact of approximately 308 square feet. The total impact to riparian habitat, permanent and temporary, is approximately 0.02 acres.

Contact Information

Name
James Hansen
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Name
Agency Name
City of Petaluma
Contact Types
Project Applicant

Location

Counties
Sonoma
Other Location Info
The project is located on the Petaluma River, in the 300 and 400 blocks of Petaluma Blvd, Petaluma, in the County of Sonoma

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search Print