Tait Wells Replacement, Decommissioning, and Rehabilitation Project
Summary
SCH Number
2016038166
Public Agency
City of Santa Cruz
Document Title
Tait Wells Replacement, Decommissioning, and Rehabilitation Project
Document Type
NOE - Notice of Exemption
Received
Posted
3/11/2016
Document Description
The City of Santa Cruz Water Department (SCWD) is proposing to replace its two wells, Tait Wells No. 1 and 3, and rehabilitate Tait Well No. 4 (separate maintenance project). The proposed Tait Well No. 1B will be drilled immediately adjacent to Tait Well No. 1. The new well will be located in a road shoulder area which is currently part of the City's right-of-way, immediately adjacent to the existing well will be replaced and will not be exceeded by the new replacement well. The new well will consist of a 14-inch diameter well drilled to 100-feet deep, similar to the existing well. Tait Well No. 1B will connect to existing power, communicaiton, and water utilities.
Contact Information
Name
Kevin Crossley
Agency Name
City of Santa Cruz Water Department
Contact Types
Lead/Public Agency
Phone
Location
Cities
Santa Cruz
Counties
Santa Cruz
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15302, 15303; 15061(b)(30
Reasons for Exemption
Replacement of existing Tait Street Street Wells No. 1 and No. 3 on sites adjacent or in proximity to the existing well site. Construction of two new replacement wells and the decommissioning of the existing wells before the new wells are operational. Therefore, the project will not result in expansion of the capacity of the wells.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.