Fleur Du Lac Maintenance Dredging and Rock Rip Rap Installation Project

Summary

SCH Number
2015118048
Public Agency
Regional Water Quality Control Board, Region 6 (Lahontan)
Document Title
Fleur Du Lac Maintenance Dredging and Rock Rip Rap Installation Project
Document Type
NOE - Notice of Exemption
Received
Posted
11/3/2015
Document Description
Fleur Du Lac will conduct maintenance dredging within the harbor and outside the harbor to remove approximately 2,150 cubic yards of lakesbed material. An excavator stationed on the shore and the harbor will be either surrounded by a turbidity curtain or existing sheet pile wall. The sediment will be transferred to lined dump trucks for transport to an approved landfill outside the Tahoe Basin.

Contact Information

Name
Tobi Tyler
Agency Name
Regional Water Quality Control Board, Region 6 (Lahontan)
Contact Types
Lead/Public Agency

Location

Counties
Placer
Other Location Info
Homewood

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15304g - Class 4
Reasons for Exemption
Minor alterations to land.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print