Sheldon Road/Waterman Road Intersection Improvement Project (PT0138)

2 Documents in Project

Summary

SCH Number
2015112015
Lead Agency
City of Elk Grove
Document Title
Sheldon Road/Waterman Road Intersection Improvement Project (PT0138)
Document Type
NOD - Notice of Determination
Received
Posted
2/22/2016
Present Land Use
Land Use - Agricultural-Residential and Agricultural. Gneeral Plan - Rural Residential
Document Description
The Sheldon Road/Waterman Road Intersection Improvement project would include a single-lane roundabout realigned to the east with a separate westbound right turn lane from southbound Waterman Road to westbound Sheldon Rd. Other improvements will include pedestrian accessible crossings at the intersection (roundabout), drainage improvements, and other incidental features. Realigned portions of Waterman Rd may extend about 700 ft north and south of Sheldon Rd. Sheldon Rd will also be reconfigured from Briskin Dr to Waterman Rd. Sheldon Rd improvements, including new roundabout, will extend about 900 ft east of the existing intersection. Realigned driveway access will be provided to adjacent properties on the west side of Waterman Rd. The widening would require acquisition of right of way from the following properties: 1) Parcel at northeast quadrant of intersection, APN: 121-0180-012. 2) Parcel at southeast quadrant of intersection, APN 127-0010-077 Additional right of way would be acquired for ultimate improvements to the intersection. Existing drainage patterns in the project area will be maintained, although ditches may be improved. All work on Sheldon Rd from Briskin Dr to Waterman Rd will be performed within the existing right of way.

Contact Information

Name
Jessica Jordan
Agency Name
City of Elk Grove
Contact Types
Lead/Public Agency

Location

Cities
Elk Grove
Counties
Sacramento
Cross Streets
Sheldon Road and Waterman Road
Zip
95758
Parcel #
Various

Notice of Determination

Approving Agency
City of Elk Grove
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.