Brian Hall and Sheila Hall Water Diversion and Stream Crossings Project 1600-2019-0590-R1

549 Documents in Project

Summary

SCH Number
2015102005
Lead Agency
Humboldt County
Document Title
Brian Hall and Sheila Hall Water Diversion and Stream Crossings Project 1600-2019-0590-R1
Document Type
NOD - Notice of Determination
Received
Posted
12/11/2020
Document Description
The project is limited to 7 encroachments. Two points of diversions POD-1 and POD-2 are for water diversion for domestic and irrigation uses. The first diversion is from a spring. The second diversion is from an onstream pond. The third encroachment is to restore the channel of the onstream pond by implementation of a Stream Restoration Plan. Work for the water diversion POD-1 spring will include use and maintenance of the water diversion infrastructure. The 4 other proposed encroachments are to upgrade failing and undersized culverts. Work for these encroachments will include excavation, removal of the failing culverts, replacement with new properly sized culverts, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion. One additional point of diversion exists depicted as Pond B, which appears to be an onstream pond subject to FGC section 1602

Contact Information

Name
Christine Hahn Vertical
Agency Name
CDFW
Contact Types
Lead/Public Agency

Name
Agency Name
Brian Hall and Sheila Hall
Contact Types
Project Applicant

Location

Cities
Dinsmore
Counties
Humboldt
Regions
Northern California
Other Location Info
The project to be completed is located within the Mad-Redwood River watershed, approximately 2.6 miles south east of the town of Dinsmore, County of Humboldt, State of California. The project is located in Section 29 T02N, R05E, Humboldt Base and Meridian; in the Showers Mountain U.S. Geological Survey 7.5-minute quadrangle; Assessor’s Parcel Number 208-201-026; latitude 40.518723 N and longitude -123.645381 W at the point of diversion (POD).

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search Print