Little Walker River Shoulder Widening Project (Streambed Alteration Agreement No. 1600-2017-0156-R6)

7 Documents in Project

Summary

SCH Number
2015052019
Lead Agency
California Department of Transportation, District 9
Document Title
Little Walker River Shoulder Widening Project (Streambed Alteration Agreement No. 1600-2017-0156-R6)
Document Type
NOD - Notice of Determination
Received
Posted
12/13/2017
Present Land Use
State Highway and Open Space
Document Description
CDFW is executing Streambed Alteration Agreement No. 1600-2017-0156-R6, pursuant to section 1602 of the Fish and Game Code to the Permittee, the Caltrans District 9, represented by Ms. Angela Calloway. The Little Walker River Shoulder Widening Project includes the expansion of the existing shoulders from two to eight feet along 3.3 miles existing highway. This project will include the removal of riparian vegetation, installation of rock-slope-protection, grading and the installation of retaining walls within the CDFW-jurisdictional West Walker River streambed. The Streambed Alteration Agreement is being issued to address the removal of 295 mature coyote willow scrubs (Salix exigua) and 6 mature yellow willow trees (Salix lutea); permanent impacts to 0.38 acres of riparian habitat, 0.001 acres of wetland habitat, and 0.06 acres of streambed. Surface flows will be diverted around the project during construction activities. Equipment staging maintenance will be located in upland locations.

Contact Information

Name
Heidi Calvert
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Counties
Mono
Cross Streets
US Route 395 and SR 108
State Highways
Hwy 395/108
Railways
No
Airports
No
Schools
No
Waterways
Little Walker River
Other Location Info
Bridgeport

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No