Karuna LLC Master Plan, Subdivision Vesting Tentative Map and Precise Development Plan
2 Documents in Project
Summary
SCH Number
2013102008
Lead Agency
Marin County
Document Title
Karuna LLC Master Plan, Subdivision Vesting Tentative Map and Precise Development Plan
Document Type
NOD - Notice of Determination
Received
Posted
2/4/2014
Present Land Use
MF2 - Multiple Family, one unit to four units per acre
Document Description
Jerry Draper, on behalf of Karuna Land, LLC was approved for a Master Plan that allows the future subdivision of a 10.6-acre lot into six lots for residential development, plus one remainder parcel. Future development would entail the construction of six new single-family residences, as well as access, utility, family residences would each be approximately 1,500 square feet in size, and would be built in two groups of three in a row aligned along the east (uphill) side of the proposed driveway. Access would be from the end of Sacramento Avenue on a common private roadway and new driveway. A total of 9 residences at 11 and 58 Sacramento Avenue, and the second unit approved for the barn) would be served by the private roadway and common driveway. A new concrete box culvert/bridge with a natural bottom would replace the two existing 24-inch diameter concrete culverts for the common driveway crossing over the creek. Drainage improvements include bioswales along the driveway, and a portion of the driveway is proposed to construct of permeable materials.
Contact Information
Name
Ben Berto
Agency Name
Marin County Com. Dev. Agency
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
San Anselmo
Counties
Marin
Cross Streets
San Francisco Blvd and Sacramento Ave
Zip
94960
Total Acres
10.6
Parcel #
177-220-10
State Highways
Hwy 101
Notice of Determination
Approving Agency
Marin County
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.