Seville Solar Farm Complex Phase I and Phase II (California Endangered Species Act Incidental Take Permit (ITP) No. 2081-2015-019-06)

6 Documents in Project

Summary

SCH Number
2013091039
Lead Agency
Imperial County
Document Title
Seville Solar Farm Complex Phase I and Phase II (California Endangered Species Act Incidental Take Permit (ITP) No. 2081-2015-019-06)
Document Type
NOD - Notice of Determination
Received
Posted
4/22/2015
Present Land Use
Agriculture A-2 (General Agriculture)
Document Description
The Project consists of the development of Phase I and II of the permitted Seville Solar Farm Complex Project. It involves construction of 50 megawatts of solar energy using photo voltaic panels on lots 4 and 5, 0.45 miles of new access roads, Imperial Irrigation District switch and project substations, Anza substation modifications, and approximately 2.6 miles of new 92 kV transmission line on a total of 683.08 acres. The solar farm is located on private land and the transmission line will be developed on public land administered by the Bureau of Land Management. The Project will result in impacts to 45.88 acres of Flat-tailed horned lizard (Phrynozoma mcallii) habitat. The Project will permanently remove 45.88 acres of Flat-tailed horned lizard habitat. The project is expected to result in incidental take of Flat-tailed horned lizard, which is designated as a candidate species under the California Endangered Species Act. The ITP referenced above as issued by CDFW authorizes incidental take of species listed under CESA that may occur as a result of Project implementation.

Contact Information

Name
Magdalena Rodriguez
Agency Name
CDFW Inland Deserts Region
Contact Types
Lead/Public Agency

Location

Counties
Imperial
Cross Streets
8 miles west of junction of SR 78 and SR 86
Zip
92024
Total Acres
1238
Parcel #
018-010-025, 018-170-004, 005, 006, 007, 008, 010, 011, 012, 013
State Highways
SR 78
Waterways
San Felipe Creek
Township
12S
Range
9E
Section
13/15
Base
SBB&M
Other Location Info
Borrego Springs

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print