San Lorenzo Valley Water District Campus Development Project

3 Documents in Project

Summary

SCH Number
2010112067
Lead Agency
San Lorenzo Valley Water District
Document Title
San Lorenzo Valley Water District Campus Development Project
Document Type
NOD - Notice of Determination
Received
Posted
5/3/2013
Present Land Use
Office and Storage/Commercial C-2/Community Commercial
Document Description
The Project is proposed to consolidate the San Lorenzo Valley Water District facilities on one site on Highway 9 in the town of Boulder Creek, Santa Cruz County. This entails remodeling an existing 8,500 square foot (sf) commercial building to serve as a new administration building at the rear of the project site, installing a fueling station on the north site consisting of one above-ground gas and one above-ground diesel tank with associated dispenser, and appurtenant structures including and outdoor operation/storage yard, driveways, 51 parking spaces and replacement of the onsite septic system. Project activities also include replacement of an 18-inch undersized culvert with two 24-inch high density polyethylene pipes, construction of bioswales, sediment and oil trap devices and underdrain systems. The wetland and riparian areas will be restored and re-vegetated. The Department of Fish and Wildlife (CDFW) is executing a Lake and Streambed Alteration Agreement Number 1600-2011-0006-R3 pursuant to Section 1602 of the Fish and Game Code to the project Permittee, San Lorenzo Valley Water District.

Contact Information

Name
Suzanne DeLeon
Agency Name
California Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Location

Counties
Santa Cruz
Cross Streets
Highway 9 and Flat Street
Zip
95006
Total Acres
1.7
Parcel #
081-204-01, -03, -04, -06, and -07
State Highways
Hwy 9
Schools
Boulder Creek Elem
Waterways
San Lorenzo River
Other Location Info
City/Nearest Community: Boulder Creek

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print