Madison Water Well and Tank/Kaiser Water Well and Tank
3 Documents in Project
Summary
SCH Number
2009051003
Lead Agency
Greenfield County Water District
Document Title
Madison Water Well and Tank/Kaiser Water Well and Tank
Document Type
NOD - Notice of Determination
Received
Posted
6/10/2009
Present Land Use
Kaiser: Vacant / C-2 Regional Commercial / GC General Commercial
Document Description
The GCWD currently owns the Kaiser site and is in the process of obtaining the Madison site (a lot in a future residential Subdivison) to construct well and tank systems that would eventually be necessary to augment their present production and storage system. The timing of construction would be phased as dictated by demand from future growth in the surrounding area. The proposed sites would be completely enclosed within security fencing and would each consist of: 1 water well, 1 ground storage tank: ~16 to 24 ft high, a diesel powered 350 to 400 KW generator for emergency power in case of power outage. Generator shall include a sound attenuated enclosure and an internal silencing system, and a small storage tank for liquid chlorine to be used for disinfection of the well water.
Contact Information
Name
Mel Johnson
Agency Name
Greenfield County Water District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Bakersfield
Counties
Kern
Cross Streets
Kaiser Well and Tank: Berkshire Road and South H Street
Zip
93307
Total Acres
0.5
Parcel #
515-010-035
State Highways
99
Railways
Yes
Airports
No
Schools
Yes
Waterways
Yes
Township
30S
Range
27E
Section
25
Base
MDB&M
Notice of Determination
Approving Agency
Greenfield County Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.