Highway 86 Domestic Water Transmission Main Phase 2 and Pump Station Addendum No. 1 tot he Initial Study/Mitigated Negative Declaration

3 Documents in Project

Summary

SCH Number
2009041034
Lead Agency
Coachella Valley Water District
Document Title
Highway 86 Domestic Water Transmission Main Phase 2 and Pump Station Addendum No. 1 tot he Initial Study/Mitigated Negative Declaration
Document Type
NOD - Notice of Determination
Received
Posted
4/3/2017
Present Land Use
Agricultural
Document Description
The purpose of the Addendum was to review and assess the minor change to the pipeline's southern alignment. The minor change in the project was determined to be consistent with the description of the environmental setting, environmental impacts and mitigation measures as set forth in the certified IS/MND (2012). The Project involves installing, operating and maintaining a 30-inch domestic water transmission pipeline to supply domestic (drinking) water and the construction and operation of a pump station.

Contact Information

Name
Sylvia Bermudez
Agency Name
Coachella Valley Water District
Contact Types
Lead/Public Agency

Location

Counties
Riverside
Cross Streets
Avenue 74 / Hwy 86 to Ave 86 / Hwy 86
Zip
92274
Total Acres
~2
Parcel #
Var
State Highways
86, 11
Railways
UPRR
Airports
Thermal
Waterways
Coachella Stormwater Channel
Township
var
Range
var
Section
var
Base
SBB&M
Other Location Info
City/Nearest Community: Salton Sea Beach/Oasis

Notice of Determination

Approving Agency
CVWD's Board of Directors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A