California WaterFix Addendum to the Final EIR
15 Documents in Project
Summary
SCH Number
2008032062
Lead Agency
California Department of Water Resources
(DWR)
Document Title
California WaterFix Addendum to the Final EIR
Document Type
NOD - Notice of Determination
Received
Posted
1/23/2018
Present Land Use
Varies between County
Document Description
Note: Per Lead Agency, NOD withdrawn (see attachment).
A NOD was submitted to the State Clearinghouse on July 21, 2017 for the CA WaterFix (CWF) Project. An Addendum was prepared summarizing the CWF project modifications associated with refinements to the transmission line corridors proposed by the Sacramento Municipal Utility District (SMUD) after the CWF Final EIR was certified and NOD was field by DWR. SMUD will be responsible for delivering power to the northern half of CWF project facilities, from just north of Hood, CA on the Sacramento River to Twin Cities Road just west of the I-5. The Addendum describes the current design of the applicable modified CWF Project power features, proposed modifications to those power features (including an explanation of the need for the modifications), the expected benefits of the modifications to the transmission lines, and potential environmental effects as a result of these power related modifications (as compared to the impacts analyzed in the Final EIR).
Contact Information
Name
Mike Bradbury
Agency Name
DWR
Contact Types
Lead/Public Agency
Phone
Location
Cities
Stockton
Counties
Contra Costa, Sacramento, San Joaquin, Solano, Yolo
Notice of Determination
Approving Agency
DWR
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.