Mariposa Lodge Domestic Water, Fire Water, and Leach Field Improvements
2 Documents in Project
Summary
SCH Number
2007052025
Lead Agency
Santa Clara County
Document Title
Mariposa Lodge Domestic Water, Fire Water, and Leach Field Improvements
Document Type
NOD - Notice of Determination
Received
Posted
6/7/2007
Present Land Use
Land Use: Regional Parks, Existing other Public Open Lands. Zoning: HR sr (Hillside, Scenic Route)
Document Description
The proposed project consists of infrastructure improvements at the Mariposa Lodge Alcohol Treatment Facility. These improvements entail the replacement of effluent fitters on the ten existing septic tanks and the expansion of the existing leach fields to the south. New and replacement water, water well, and fire protection piping would be installed to service the facilities with water from a storage tank located east of the property. A total of approx. 2,275 feet of piping would be installed throughout the facility. A future well is also anticipated to be drilled in the proximity of the current storage tank and electrical conduits and a junction box would be installed to power the future well.
Contact Information
Name
Roger Soohoo
Agency Name
Santa Clara County Facilities and Fleet
Contact Types
Lead/Public Agency
Phone
Location
Cities
San Jose
Counties
Santa Clara
Cross Streets
Malech Road and US Highway 101
Zip
95131
Total Acres
18.6
Parcel #
729-57-002
State Highways
101
Railways
SPRR
Schools
Martin Murphy MS, Los Paseos Elem
Waterways
Coyote Creek
Notice of Determination
Approving Agency
Santa Clara County Facilities and Fleet Dept.
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.