Clear Creek Wastewater Treatment Plan Rehabilitation and Expansion Project, Bid Package 6 (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-4971-250
9 Documents in Project
Summary
SCH Number
2007012119
Lead Agency
City of Redding
Document Title
Clear Creek Wastewater Treatment Plan Rehabilitation and Expansion Project, Bid Package 6 (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-4971-250
Document Type
NOD - Notice of Determination
Received
Posted
9/3/2009
Document Description
The Project will increase disinfection capacity of the Clear Creek WWTP's peak wet weather flow to 40 million gallons per day (MGD). A new chlorine evaportor disinfection system will be constructed to disinfect flows up to 40 MGD, thus increasing the treatment capacity of the Clear Creek WWTP. Project construction also includes modification of the existingaeration basins and constructionof a new aeration blower building. The existing 3 aeration basins will be renovated by reconfiguring the interior basin walls, installing new baffle walls, and replacing the existing surface aerators with a fine bubble aeration system. Fine bubble diffusers will be installed on the basin floors of the second partition in each of the aeration basins. A Mixed Liquor Return and Return Activated Sludge (RAS) distribution system and a RAS flow meter vault will be constructed to support the aeration system operations. The Clear Creek WWTP's existing potable water system is used for sanitary facilities and lab samples, while the non-potable water system is used for non-potable utility water and landscaping. Piping for both of these systems will be rehabilitated, as needed, due to corrosion and insufficient flow capacity.
Contact Information
Name
Michelle L. Jones
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency
Phone
Location
Cities
Redding
Counties
Shasta
Cross Streets
Highway 273 and Metz Road
Zip
96001
Total Acres
50
Parcel #
050-020-012-000
State Highways
Hwy. 273
Railways
SPRR
Waterways
Sacramento River
Township
31N
Range
4W
Section
30
Base
MDBM
Notice of Determination
Approving Agency
SWRCB
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.