Shasta Lake Master Water Plan Improvements (E 05-01)

2 Documents in Project

Summary

SCH Number
2006052088
Lead Agency
City of Shasta Lake
Document Title
Shasta Lake Master Water Plan Improvements (E 05-01)
Document Type
NOD - Notice of Determination
Received
Posted
6/20/2006
Present Land Use
The site of the Raw Water Pump Station improvements is located at the base of Shasta Dam; Water Treatment Plan improvements are located on federal lands; water main improvements are located in public right-of-way and on vacant land as identified in the IS. General Plan and Zone of Shasta Dam property is Public Facility. Zoning of the water main improvements within the City of Shasta Lake is Interim Residential and Unclassified with a General Plan designation of Suburban Residential.
Document Description
Implementation of a portion of the improvements identified in the City of Shasta Lake Master Water Plan to improve capacity, reliability and efficiency of the City's water treatment and distribution systems, including Raw Water Pump Station Improvements at the base of Shasta Dam, Water Treatment Plant Improvements (installation of a new 12,000 gallon raw water tank and conversion of the existing tank to a clear water tank), and Water Distribution System Improvements (including replacement and installation of water lines).

Contact Information

Name
Carla L. Thompson
Agency Name
City of Shasta Lake
Contact Types
Lead/Public Agency

Location

Cities
Shasta Lake
Counties
Shasta
Cross Streets
Lake Boulevard / Shasta Dam Boulevard
Zip
96019
Total Acres
+/- 10
Parcel #
006-790-014, 015; 065-500-001; 065-510-001
State Highways
151
Railways
UPRR
Schools
Mountain Lakes HS (Toyon School), Grand Oaks ES, Central Valley
Waterways
Churn Creek, North Branch of Churn Creek, Salt Creek
Township
33N
Range
5W
Section
14,15,
Base
MDM
Other Information
Section: 25, 26 Schools: HS, Shasta Lake School.

Notice of Determination

Approving Agency
City of Shasta Lake
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print