Removal of the Yolo Basin Experimental Fish Passage Project
3 Documents in Project
Summary
SCH Number
2006042001
Lead Agency
California Department of Water Resources
(DWR)
Document Title
Removal of the Yolo Basin Experimental Fish Passage Project
Document Type
NEG - Negative Declaration
Received
Present Land Use
Flood Control Levee
Document Description
The objective of this project is to remove a fish passage facility (a weir) from the Yolo Bypass Toe Drain. The facility was constructed in 2003 to study movement of fish past a barrier, and was expected to be used for three years. The facility consists of a number of elements, all of which will be removed: 20 vertical steel "H" piles which provide the framework for the structure; 40 steel plates, placed vertically between the "H" piles of the framework; 2 boat ramps; staging are; and the access road from the levee to the boat ramps.
Contact Information
Name
Patty Quicken
Agency Name
Department of Water Resources
Contact Types
Lead/Public Agency
Phone
Location
Cities
West Sacramento
Counties
Yolo
Cross Streets
Industrial Boulevard
Parcel #
33-12-35
State Highways
I-80
Waterways
Sacramento Ship Channel, Toe Drain in Yolo Bypass
Township
8N
Range
3E
Section
13
Base
MDBM
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Parks and Recreation, California Department of State Parks, Division of Boating and Waterways, California Department of Transportation, District 5 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB), California State Lands Commission (SLC), Central Valley Flood Protection Board, Delta Protection Commission, Department of Fish and Wildlife, Marine Region, Office of Emergency Services, California, Resources Agency, Department of Water Resources
State Reviewing Agency Comments
Department of Water Resources
Development Types
Other (removal-fish passage facility,staging area,access road,boat ramp)
Project Issues
Vegetation, Wetland/Riparian, Wildlife
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.