I-15 Northbound Truck Descending Lane and Pavement Rehabilitation
5 Documents in Project
Summary
SCH Number
2005121183
Lead Agency
California Department of Transportation, District 8
Document Title
I-15 Northbound Truck Descending Lane and Pavement Rehabilitation
Document Type
NOD - Notice of Determination
Received
Posted
3/21/2007
Document Description
The California Department of Transportation proposes to improve a portion of Interstate 15 beginning from 0.37 miles south of Bailey Road and ending 0.68 miles north of Yates Well Road. This 12-mile long project will extend from Postmile 171.1 to 182.1. The proposed improvements would add an inside truck-descending lane on the northbound travel-way and would reconstruct and widen the inside shoulder on both directions with the same cross-slope and structural section as the mainline. The project also proposes to rehabilitate the existing pavement and improve highway operational characteristics by upgrading roadway features to current geometric standards. The project will reduce northbound traffic congestion and improve safety and operations in this portion of I-15.
Contact Information
Name
Boniface Udotor
Agency Name
Department of Transportation, District 8
Contact Types
Lead/Public Agency
Phone
Location
Counties
San Bernardino
Cross Streets
Along I-15 between Bailey Road and Yates Wells Road (Postmiles 171.1 to 182.1)
State Highways
I-15
Other Location Info
Near the California/Nevada State Line
Notice of Determination
Approving Agency
Department of Transportation
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A