Neenach Pumping Station Turnout Facility

3 Documents in Project

Summary

SCH Number
2005041169
Lead Agency
City of Los Angeles
Document Title
Neenach Pumping Station Turnout Facility
Document Type
NOD - Notice of Determination
Received
Posted
5/31/2006
Present Land Use
Public Facilities
Document Description
LADWP is proposing to construct and operate the Neenach Pumping Station Turnout Facility to allow direct deliveries of raw water from the California Aqueduct to Los Angeles via the First Los Angeles Aqueduct (FLAA) to make up for reduced withdrawals from the eastern Sierras as well as to enhance existing system reliability by permitting an alternative means of making deliveries into the LADWP system. DWR must separately approve the delivery of non-State Water Project (SWP) water to the proposed turnout. Once the source of any non-SWP water LADWP plans to procure is identified, that transaction will be evaluated for compliance with CEQA as a separate Project.

Contact Information

Name
Craig Trombly
Agency Name
Department of Water Resources
Contact Types
Lead/Public Agency

Location

Cities
Lancaster
Counties
Los Angeles
Cross Streets
Three Points Road / Avenue C
Zip
93536
Total Acres
1.5
State Highways
138
Waterways
California Aqueduct
Township
8N
Range
16W
Section
16
Other Location Info
Elizabeth Lake

Notice of Determination

Approving Agency
Department of Water Resources
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print