Hillcrest Park Reservoir Reconstruction

2 Documents in Project

Summary

SCH Number
2005031091
Lead Agency
City of Fullerton
Document Title
Hillcrest Park Reservoir Reconstruction
Document Type
NOD - Notice of Determination
Received
Posted
5/20/2005
Present Land Use
PL - Public Land / Park and Recreation
Document Description
The City of Fullerton is proposing to replace the existing, deteriorated Hillcrest Reservoir and associated piping. The project includes removing the existing reservoir, which was a 5 million gallon capacity and an oval-shaped footprint, and constructing a new circular shaped reservoir having the same capacity. The proposed reservoir will be constructed at the same location as the existing tank, at a similar elevation. The new reservoir tank will buried beneath the surface of the ground, and the area above it will be made accessible for public use. The project also includes construction of an 18" inlet-outlet pipeline and 18" drain line from the reservoir, through the park, south to Valley View Drive. Piping will also be installed within the Valley View right of way from Harbor Blvd. to Lemon Street. This will result in temporary road closures during construction.

Contact Information

Name
Lorrie Lausten
Agency Name
City of Fullerton
Contact Types
Lead/Public Agency

Location

Cities
Fullerton
Counties
Orange
Cross Streets
Lemon Street / Valley View Drive
Zip
92831
Parcel #
029-01-09
State Highways
SR 57, SR 91
Railways
ATSF
Schools
Fullerton JC, Fullerton Union HS, Troy HS, Raymond ES, Acacia ES
Other Information
Schools: Beechwood ES, Rolling Hills ES, Maple ES, Commonwealth ES, Richman ES, Cal State Fullerton, Ladera Vista JH

Notice of Determination

Approving Agency
City of Fullerton
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print