Tally Road Water Storage Tank
3 Documents in Project
Summary
SCH Number
2005031053
Lead Agency
Eastern Municipal Water District
Document Title
Tally Road Water Storage Tank
Document Type
NOD - Notice of Determination
Received
Posted
5/23/2005
Present Land Use
Medium Density Residential
Document Description
The proposed project consists of the construction of a 1.5 million gallon water storage tank including site drainage facilities, access road, and supply pipeline within the Antelope Pressure Zone to provide water storage capacity for the new homes presently being constructed in the area. The purpose of the water storage tank will be to provide adequate fire flow for fire hydrants, provide adequate capacity to meet the established maximum day demand that would, for example, occur during the hottest summer day, and to provide adequate emergency capacity should electric power be interrupted. The current water storage and distribution system within the Antelope Pressure Zone does not have the capacity to meet those provisions for the new homes presently being constructed in the surrounding area.
Contact Information
Name
Karen Hackett
Agency Name
Eastern Municipal Water District
Contact Types
Lead/Public Agency
Phone
Location
Counties
Riverside
Cross Streets
Tally Road / Tate Road
State Highways
215
Schools
Menifee ES
Waterways
Salt Creek
Township
5S
Range
3W
Section
27
Base
SBBM
Other Location Info
Sun City
Notice of Determination
Approving Agency
Eastern Municipal Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.