Lake Arrowhead Community Services District - New Wells and Related Infrastructure Project

4 Documents in Project

Summary

SCH Number
2004031160
Lead Agency
Lake Arrowhead Community Services District
Document Title
Lake Arrowhead Community Services District - New Wells and Related Infrastructure Project
Document Type
NOD - Notice of Determination
Received
Posted
5/6/2004
Present Land Use
Land uses vary from recreational (golf course) to floodway
Document Description
The project generally consists of the drilling, installation, development, test-pumping and production of up to five new municipal wells with ancillary facilities in the Grass Valley area where Wells #1 and #2 were recently developed. Proposed Wells #4 and #5 and associated infrastructure will be developed first. Proposed Wells #3, #6 and ALA #2 and associated infrastructure are proposed for future development. The wells will be drilled at a 6-inch diameter and to an estimated depth of ~800 feet in granite bedrock using the air hammer drilling method, also known as the dual wall reverse circulation method. A pipeline will be installed to connect the new wells to the existing water collection system located at the well field.

Contact Information

Name
Marvin Shaw
Agency Name
Lake Arrowhead Community Services District
Contact Types
Lead/Public Agency

Location

Counties
San Bernardino
Cross Streets
Grass Valley Road and Golf Course Road
State Highways
189
Waterways
Grass Valley Creek
Township
2 N
Range
3 W
Section
17,20
Base
SBM
Other Location Info
Nearest City: Lake Arrowhead

Notice of Determination

Approving Agency
Lake Arrowhead Community Services District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.