Poche Beach Structure (Best Management Practice Water Treatment System)
3 Documents in Project
Summary
SCH Number
2002091129
Lead Agency
Orange County
Document Title
Poche Beach Structure (Best Management Practice Water Treatment System)
Document Type
NOD - Notice of Determination
Received
Posted
8/23/2007
Present Land Use
Right-of-way used by the railroad.
Document Description
The CDFG is issuing an Agreement regarding the Stream or Lake Alteration to the project applicant, Sonia Nasser, representing the County of Orange. The applicant proposes to alter the streambed of Prima Deshecha Creek to accommodate the Poche Beach Modular Treatment System in order to reduce bacterial loading at Poche Beach. This will include collecting urban runoff from Prima Deshecha Creek near the ocean outlet, treating the water in a portable modular treatment system to remove bacteria, and releasing the water back onto Poche Beach. Approximately 700,000 gallons per day of dry-weather urban runoff will be collected using an inflatable rubber dam structure. Water will be diverted by the inflatable rubber dam into a wet well adjacent to the channel on railroad property between Pacific Coast Highway and the railroad tracks. There, the water will be treated, using ultraviolet disinfection to remove bacteria, and released at the beach outlet where it will flow along its original course to the ocean. The inflatable rubber dam will be deflated when rain is anticipated, and in the case of unexpected rainfall, the high water sensor will automatically deflate the rubber dam to prevent constriction of the drainage flow path. (SAA# 1600-2006-0078-R5)
Contact Information
Name
Tamara Spear
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Dana Point
Counties
Orange
Cross Streets
Pacific Coast Highway and Camino Capistrano
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No