American River Pump Station Project

6 Documents in Project

Summary

SCH Number
1999062089
Lead Agency
Placer County Water Agency
Document Title
American River Pump Station Project
Document Type
NOD - Notice of Determination
Received
Posted
8/5/2002
Present Land Use
Reclamation jurisdiction over lands acquired for the Auburn Dam Project adjacent Placer County lands are designed Agriculture/Timberland.
Document Description
The Proposed Project involves construction of a year-round pump station, intake/diversion and associated pipelines and access road facilities to provide PCWA improved and reliable access to its Middle Fork Project water rights water. The project is needed to provide a reliable back-up source to PCWA's other water supply sources and to meet growing demands associated with planned and approved urban development within their service area. The new pump station would permit PCWA to increase their water supply diversions from the historical maximum amount of 8,500 AF and from the anticipated No Action/No Project Alternative amount of 19,300 AF to 35,500 AF. Additionally, the Proposed Project would restore the North Fork American River flow to a 3/4-mile stretch of river that is currently dewatered and flowing through the Auburn Dam construction site bypass tunnel. The return of water to the river channel is anticipated to result in use of the project area for water-based recreation activity (primarily boating) and so, the Proposed Project also includes development of two public river access sites. The access locations would be at the Auburn Dam site upstream of the bypass tunnel outlet, and near Oregon Bar. The proposed amenities include parking, road and trail improvements to accommodate mixed recreation uses, a staffed entrance gate, and sanitation facilities (restrooms and trash cans). CDPR would oversee the use of these areas per an agreement with Reclamation.

Contact Information

Name
Brent Smith
Agency Name
Placer County Water Agency
Contact Types
Lead/Public Agency

Location

Cities
Auburn
Counties
Placer
Cross Streets
Maidu Drive/Pacific Avenue
Zip
95603
Total Acres
26
State Highways
49
Railways
Union Pacific
Schools
Skyridge Elementary/Placer High School
Waterways
American River
Township
12N
Range
8E
Section
14/23

Notice of Determination

Approving Agency
Placer County Water Agency
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print