FAA POWER CABLE REPLACEMENT AT LAKE TAHOE AIRPORT
Summary
SCH Number
1995100287
Lead Agency
Regional Water Quality Control Board, Region 6 (Lahontan)
Document Title
FAA POWER CABLE REPLACEMENT AT LAKE TAHOE AIRPORT
Document Type
NOD - Notice of Determination
Received
Posted
5/5/1995
Document Description
REPALCE POWER CABLE NEAR RUNWAY 18. PROJECT INVOLVES 2000 L.F. OF TRENCHING IN UPPER TRUCKEE RIVER MEADOW. MITI- GATION ON UPPER TRUCKEE RIVER.
Contact Information
Name
LAURI KEMPER
Agency Name
RWQCB
Contact Types
Lead/Public Agency
Phone
Location
Cities
South Lake Tahoe
Counties
El Dorado
Notice of Determination
Approving Agency
N/A
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.